OAKMOREL Forensic Intelligence // [email protected]
42 U.S.C. § 8353 42 u.s.c. · powerplant and industrial fuel use · title 42
42 U.S.C. § 8353
General requirements for exemptions
Title 42 USC
● ACTIVE
Ch. 92
Jurisdiction Federal — United States
Chapter POWERPLANT AND INDUSTRIAL FUEL USE
Primary Source uscode.house.gov ↗
Federation ID OM-USC42-SEC-5C235D
STATUTORY TEXT primary source · verbatim · uscode.house.gov

U.S.C. Title 42 - THE PUBLIC HEALTH AND WELFARE 42 U.S.C. United States Code, 2023 Edition Title 42 - THE PUBLIC HEALTH AND WELFARE CHAPTER 92 - POWERPLANT AND INDUSTRIAL FUEL USE SUBCHAPTER III - EXISTING FACILITIES Part B - Exemptions Sec. 8353 - General requirements for exemptions From the U.S. Government Publishing Office, www.gpo.gov

§8353. General requirements for exemptions

(a) Use of mixtures or fluidized bed combustion not feasible Except in the case of an exemption under section 8352(b), (f), or (i) of this title, the Secretary may grant a permanent exemption for a powerplant under this part only— (1) if the applicant has demonstrated that the use of a mixture of natural gas or petroleum and coal (or other alternate fuels), for which an exemption under section 8352(b) of this title would be available, is not economically or technically feasible; and (2) if the Secretary has not made a finding that the use of a method of fluidized bed combustion of coal or an alternate fuel is economically and technically feasible. (b) No alternative power supply in case of a powerplant (1) In the case of an exemption under section 8352(b) or (g) of this title, the Secretary may not grant an exemption for an existing powerplant unless he finds that the petitioner has demonstrated that there is no alternative supply of electric power which is available within a reasonable distance at a reasonable cost without impairing short-run or long-run reliability of service and which can be obtained by the petitioner, despite reasonable good faith efforts. (2) The Secretary shall forward a copy of any such petition to the Federal Energy Regulatory Commission promptly after it is filed with the Secretary and shall consult with the Commission before making any finding on such petition under paragraph (l).

(Pub. L. 95–620, title III, §313, Nov. 9, 1978, 92 Stat. 3313; Pub. L. 100–42, §1(c)(10), (13), May 21, 1987, 101 Stat. 313.)

Editorial Notes

Amendments 1987—Subsec. (a). Pub. L. 100–42, §1(c)(13), struck out "or installation" after "powerplant" in introductory provisions. Pub. L. 100–42, §1(c)(10), which directed the substitution of "or (i)" for "(i), or (j)" was executed by making the substitution for "(i) or (j)" to reflect the probable intent of Congress.

Statutory Notes and Related Subsidiaries Exemption for Certain Electric Powerplants as Effective Prior to 180 Days After November 9, 1978 For effectiveness of exemption for certain electric powerplants as prior to 180 days after Nov. 9, 1978, see section 902(a) of Pub. L. 95–620, set out as a note under section 8301 of this title.

Source: uscode.house.gov — public domain Official Source ↗
ROOT-LD ENTITY DATA machine-readable · federation graph · v1.0
Federation ID
OM-USC42-SEC-5C235D
Entity Class
STATUTE / FEDERAL-CODE-SECTION
Domain Signature
oakmorel.com
Spec Version
Root-LD v1.0
Source
PRIMARY-SOURCE
Content Hash
1c71b57d3cc1b650...
Source Verified
✓ TRUE
Semantic Edges
PENDING — corpus passes queued
The statutory text of 42 U.S.C. § 8353 is reproduced from the official United States Code as published by the Office of the Law Revision Counsel of the U.S. House of Representatives (uscode.house.gov).
OakMorel Law
42 U.S.C.
Citation
42 U.S.C. § 8353
Status
● ACTIVE
Chapter
92 — POWERPLANT AND INDUSTRIAL FUEL USE
Title
The Public Health and Welfare
Jurisdiction
Federal
Federation ID
OM-USC42-SEC-5C235D
Root-LD Spec
v1.0
► Forensic Services
Procurement fraud, platform integrity, litigation support. First conversation free.
► CONTACT OAKMOREL →
↑↓ Scroll ENTER Select ESC Exit
The Public Health and Welfare — 42 U.S.C. § 8353