OAKMOREL Forensic Intelligence // [email protected]
15 U.S.C. § 720a 15 u.s.c. · alaska natural gas pipeline · title 15
15 U.S.C. § 720a
Issuance of certificate of public convenience and necessity
Title 15 USC
● ACTIVE
Ch. 15D
Jurisdiction Federal — United States
Chapter ALASKA NATURAL GAS PIPELINE
Primary Source uscode.house.gov ↗
Federation ID OM-USC15-SEC-A8F5A9
STATUTORY TEXT primary source · verbatim · uscode.house.gov

U.S.C. Title 15 - COMMERCE AND TRADE 15 U.S.C. United States Code, 2023 Edition Title 15 - COMMERCE AND TRADE CHAPTER 15D - ALASKA NATURAL GAS PIPELINE Sec. 720a - Issuance of certificate of public convenience and necessity From the U.S. Government Publishing Office, www.gpo.gov

§720a. Issuance of certificate of public convenience and necessity

(a) Authority of the Commission Notwithstanding the Alaska Natural Gas Transportation Act of 1976 (15 U.S.C. 719 et seq.), the Commission may, in accordance with section 7(c) of the Natural Gas Act (15 U.S.C. 717f(c)), consider and act on an application for the issuance of a certificate of public convenience and necessity authorizing the construction and operation of an Alaska natural gas transportation project other than the Alaska natural gas transportation system. (b) Issuance of certificate (1) In general The Commission shall issue a certificate of public convenience and necessity authorizing the construction and operation of an Alaska natural gas transportation project under this section if the applicant has satisfied the requirements of section 7(e) of the Natural Gas Act (15 U.S.C. 717f(e)). (2) Considerations In considering an application under this section, the Commission shall presume that— (A) a public need exists to construct and operate the proposed Alaska natural gas transportation project; and (B) sufficient downstream capacity will exist to transport the Alaska natural gas moving through the project to markets in the contiguous United States. (c) Expedited approval process Not later than 60 days after the date of issuance of the final environmental impact statement under section 720b of this title for an Alaska natural gas transportation project, the Commission shall issue a final order granting or denying any application for a certificate of public convenience and necessity for the project under section 7(c) of the Natural Gas Act (15 U.S.C. 717f(c)) and this section. (d) Prohibition of certain pipeline route No license, permit, lease, right-of-way, authorization, or other approval required under Federal law for the construction of any pipeline to transport natural gas from land within the Prudhoe Bay oil and gas lease area may be granted for any pipeline that follows a route that— (1) traverses land beneath navigable waters (as defined in section 1301 of title 43) beneath, or the adjacent shoreline of, the Beaufort Sea; and (2) enters Canada at any point north of 68 degrees north latitude. (e) Open season (1) In general Not later than 120 days after October 13, 2004, the Commission shall issue regulations governing the conduct of open seasons for Alaska natural gas transportation projects (including procedures for the allocation of capacity). (2) Regulations The regulations referred to in paragraph (1) shall— (A) include the criteria for and timing of any open seasons; (B) promote competition in the exploration, development, and production of Alaska natural gas; and (C) for any open season for capacity exceeding the initial capacity, provide the opportunity for the transportation of natural gas other than from the Prudhoe Bay and Point Thomson units. (3) Applicability Except in a case in which an expansion is ordered in accordance with section 720c of this title, initial or expansion capacity on any Alaska natural gas transportation project shall be allocated in accordance with procedures to be established by the Commission in regulations issued under paragraph (1). (f) Projects in the contiguous United States (1) In general An application for additional or expanded pipeline facilities that may be required to transport Alaska natural gas from Canada to markets in the contiguous United States may be made in accordance with the Natural Gas Act [15 U.S.C. 717 et seq.]. (2) Expansion To the extent that a pipeline facility described in paragraph (1) includes the expansion of any facility constructed in accordance with the Alaska Natural Gas Transportation Act of 1976 (15 U.S.C. 719 et seq.), that Act shall continue to apply. (g) Study of in-State needs The holder of the certificate of public convenience and necessity issued, modified, or amended by the Commission for an Alaska natural gas transportation project shall demonstrate that the holder has conducted a study of Alaska in-State needs, including tie-in points along the Alaska natural gas transportation project for in-State access. (h) Alaska royalty gas (1) In general Except as provided in paragraph (2), the Commission, on a request by the State and after a hearing, may provide for reasonable access to the Alaska natural gas transportation project by the State (or State designee) for the transportation of royalty gas of the State for the purpose of meeting local consumption needs within the State. (2) Exception The rates of shippers of subscribed capacity on an Alaska natural gas transportation project described in paragraph (1), as in effect as of the date on which access under that paragraph is granted, shall not be increased as a result of such access. (i) Regulations The Commission may issue such regulations as are necessary to carry out this section.

(Pub. L. 108–324, div. C, §103, Oct. 13, 2004, 118 Stat. 1256.)

Editorial Notes

References in Text The Alaska Natural Gas Transportation Act of 1976, referred to in subsecs. (a) and (f)(2), is Pub. L. 94–586, Oct. 22, 1976, 90 Stat. 2903, which is classified generally to chapter 15C (§719 et seq.) of this title. For complete classification of this Act to the Code, see Short Title note set out under section 719 of this title and Tables. The Natural Gas Act, referred to in subsec. (f)(1), is act June 21, 1938, ch. 556, 52 Stat. 821, which is classified generally to chapter 15B (§717 et seq.) of this title. For complete classification of this Act to the Code, see section 717w of this title and Tables.

Source: uscode.house.gov — public domain Official Source ↗
ROOT-LD ENTITY DATA machine-readable · federation graph · v1.0
Federation ID
OM-USC15-SEC-A8F5A9
Entity Class
STATUTE / FEDERAL-CODE-SECTION
Domain Signature
oakmorel.com
Spec Version
Root-LD v1.0
Source
PRIMARY-SOURCE
Content Hash
a4c3bdb8d06280a4...
Source Verified
✓ TRUE
Semantic Edges
PENDING — corpus passes queued
The statutory text of 15 U.S.C. § 720a is reproduced from the official United States Code as published by the Office of the Law Revision Counsel of the U.S. House of Representatives (uscode.house.gov).
OakMorel Law
15 U.S.C.
Citation
15 U.S.C. § 720a
Status
● ACTIVE
Chapter
15D — ALASKA NATURAL GAS PIPELINE
Title
Commerce and Trade
Jurisdiction
Federal
Federation ID
OM-USC15-SEC-A8F5A9
Root-LD Spec
v1.0
► Forensic Services
Procurement fraud, platform integrity, litigation support. First conversation free.
► CONTACT OAKMOREL →
↑↓ Scroll ENTER Select ESC Exit
Commerce and Trade — 15 U.S.C. § 720a